We've got lots of success stories but we wanted to share just a few with you
Project Wytch Farm
Active Flow Controls was asked to design and supply a high-pressure unregulated meter module to connect to existing CL300 connections, to replace a legacy installation that had reached the end of its life.
Project Mogden (Biogas)
Active Flow were asked to design and supply a Biomethane PRS for Thames Water through their M&E contractor
Project Ashford
Active Flow were asked to provide a typical Medium Pressure twin stream Pressure Reducing Station with a minimum inlet pressure of 350mb and 25-50mb outlet (profiled).
Project Alma
This was an unusual project for Active Flow in that a twin-stream medium-pressure meter module c/w bypass was required in four weeks, but had to fit through the doors of an already-built meter room.